Write An Essay logo
  • Home
  • Dissertation Writing
  • Essay Writing
  • Personal Statement
  • My account
  • Order now
Order Now
Uncategorized

MGT530- project management ( CT )

4 min read
Posted on 
November 25th, 2021
Home Uncategorized MGT530- project management ( CT )

Instructions:

Consider a recent project that you have worked on. This could be for a company or organization with which you are familiar, or even a personal project such as purchasing a home or planning a family gathering.

After your opening paragraph, which includes your thesis statement, identify your selected company or organization in no more than three paragraphs. Then, complete the following:

*Note: for the charts/diagrams, use MS Word, Excel, Google Docs or Google Sheets. You may also use any other suitable project-based software. A free Project management software called Libre is also available for download here https://sourceforge.net/projects/projectlibre/

  1. Create either a Work Breakdown Structure (WBS) of the project or Gantt Chart for planning and scheduling the project. Discuss why you used the type of chart you did.
  2. Determine and document both probabilistic (t0, tp, and tm) and deterministic time estimates. Discuss how you arrived at these time estimates.
  3. Using MS Word, Google Docs, or similar software, create a PERT network diagram with the Critical Path (CP) identified.
  4. Calculate the slack time for each activity. Discuss the ramifications of slack in the CP for the activities and the project as a whole.
  5. Develop the network diagram from the probability estimates. Discuss which path you would take and why.
  6. For each activity, determine hypothetical costs in a table. Include budgeted costs, percent complete, actual/projected cost, and over/under budget (and total). Discuss the rationale for how you derived these costs.
  7. Crash an activity on the Critical Path. Discuss the ramifications of crashing the activity you crashed.

Formatting requirements:

  • Plagiarism must be less 15%
  • Your assignment is required to be 6-8 pages in length, which does not include the title page and reference pages, which are never a part of the content minimum requirements.
  • Charts/diagrams should be labeled and can be added within the body of your paper.
  • Support your submission with course material concepts, principles, and theories from the textbook and at least three scholarly, peer-reviewed journal articles.
  • Formatted according to APA 7th edition and University writing standards.
  • It is strongly encouraged that you submit all assignments into Turnitin prior to submitting them to your instructor for grading. If you are unsure how to submit an assignment into the Originality Check tool,
attachment_1

Instructions:

Consider a recent project that you have worked on. This could be for a company or organization with which you are familiar, or even a personal project such as purchasing a home or planning a family gathering.

After your opening paragraph, which includes your thesis statement, identify your selected company or organization in no more than three paragraphs. Then, complete the following:

*Note: for the charts/diagrams, use MS Word, Excel, Google Docs or Google Sheets. You may also use any other suitable project-based software. A free Project management software called Libre is also available for download here https://sourceforge.net/projects/projectlibre/

  1. Create either a Work Breakdown Structure (WBS) of the project or Gantt Chart for planning and scheduling the project. Discuss why you used the type of chart you did.
  2. Determine and document both probabilistic (t0, tp, and tm) and deterministic time estimates. Discuss how you arrived at these time estimates.
  3. Using MS Word, Google Docs, or similar software, create a PERT network diagram with the Critical Path (CP) identified.
  4. Calculate the slack time for each activity. Discuss the ramifications of slack in the CP for the activities and the project as a whole.
  5. Develop the network diagram from the probability estimates. Discuss which path you would take and why.
  6. For each activity, determine hypothetical costs in a table. Include budgeted costs, percent complete, actual/projected cost, and over/under budget (and total). Discuss the rationale for how you derived these costs.
  7. Crash an activity on the Critical Path. Discuss the ramifications of crashing the activity you crashed.

Formatting requirements:

  • Plagiarism must be less 15%
  • Your assignment is required to be 6-8 pages in length, which does not include the title page and reference pages, which are never a part of the content minimum requirements.
  • Charts/diagrams should be labeled and can be added within the body of your paper.
  • Support your submission with course material concepts, principles, and theories from the textbook and at least three scholarly, peer-reviewed journal articles.
  • Formatted according to APA 7th edition and University writing standards.
  • It is strongly encouraged that you submit all assignments into Turnitin prior to submitting them to your instructor for grading. If you are unsure how to submit an assignment into the Originality Check tool,
attachment_1

Order an Essay Now & Get These Features For Free:

Turnitin Report

Formatting

Title Page

Citation

Outline

Place an Order
Share
Tweet
Share
Tweet
Calculate the price
Pages (275 words)
$0.00
Write An Essay
Company
  • Why Choose Us
  • About Us
  • Terms
  • Dissertation Help
  • Personal Statement
  • Research Paper Format
  • Term Papers
Legal
  • Write My Essay
  • Thesis Format
  • Custom Papers
  • Coursework Writing
  • Dissertation Writing
  • Essay Writing
How Our Service is Used:
Write An Essay essays are NOT intended to be forwarded as finalized work as it is only strictly meant to be used for research and study purposes. Write An Essay does not endorse or condone any type of plagiarism.
Subscribe
No Spam
© 2023 Write An Essay. All rights reserved.
Write An Essay will be listed as ‘Write An Essay’ on your bank statement.