E18-21

 

Calculating Activity-based Costing Overhead Rates

 

Assume that manufacturing overhead for Glassman Company in the previous exercise consisted of the following activities and costs:

 

Setup (1,000 setup hours)                                            $144,000

 

Production scheduling (400 batches)                       60,000

 

Production engineering (60 change orders)         120,000

 

Supervision (2,000 direct labor hours)                     56,000

 

Machine maintenance (12,000 machine hours)  84,000

 

Total activity costs                                                           $464,000

 

 

 

The following additional data were provided for Job 845:

 

Direct materials costs                                                     $7,000

 

Direct labor cost (5 Milling direct labor hours;

 

35 Finishing direct labor hours)                                  $1000

 

Setup hours                                                                       5 hours

 

Production scheduling                                                   1 batch

 

Machine hours used (25 Milling machine hours;

 

5 Finishing machine hours                                            30 hours

 

Production engineering                                                                3 change orders

 

 

 

  1. Calculate the cost per unit of activity driver for each activity cost category.

  2. Calculate the cost of Job 845 using ABC to assign the overhead costs.

  3. Calculate the cost of Job 845 using the plantwide overhead rate based on machine hours calculated in the previous exercise.

  4. Calculate the cost of Job 845 using the machine hour departmental overhead rate for the Milling Department and a direct labor hour overhead rate for the Finishing Department.

 

 

 

E18-24

 

Traditional Product Costing versus Activity Based Costing

 

Assume that Panasonic Company has determined its estimated total manufacturing overhead cost for one of its plants to be $204,000 consisting of the following activity cost pools for the month.

 

Activity Center                                 Activity Costs                    Cost Driver                         Activity Level

 

Assembly setup                                                $45,000                 Setup hours                                       1,500

 

Material Handling                            15,000                                  Number of moves                              300

 

Assembly                                            120,000                 Assembly hours                                             12,000

 

Maintenance                                       24,000                                Maintenance hours                       1,200

 

Total                                                   $204,000

 

Total direct labor hours used during the month were 8,000. Panasonic produced many different electronic products, including the following two products produced during the current month:

 

                                                                                                                Model x301                        Modelz205

 

                Units produced                                                                   1,000                                   1,000

 

                Direct material cost                                                     $15,000                                 $15,000

 

                Direct Labor Cost                                                          $12,500                             $12,500

 

                Direct Labor hours                                                                500                                         500

 

                Setup hours                                                                              50                                         100

 

                Material moves                                                                                       25                                           50                                   

 

                Assembly hours                                                                                     800                                         800

 

                Maintenance hours                                                                10                                          40

 

 

 

a.  Calculate the total cost per-unit cost of each model using direct labor hours to assign manufacturing overhead to products.

 

b.  Calculate the total per-unit cost of each model using activity-based costing to assign manufacturing overhead to products.

 

c.  Comment on the accuracy of the two methods for determining costs.

 

d.  Discuss some of the strategic implications of your answers to the previous requirements.      

Order an Essay Now & Get These Features For Free:

Turnitin Report

Formatting

Title Page

Citation

Outline

Place an Order
Share
Tweet
Share
Tweet
Calculate the price
Pages (275 words)
$0.00
Write An Essay
Company
  • Why Choose Us
  • About Us
  • Terms
  • Dissertation Help
  • Personal Statement
  • Research Paper Format
  • Term Papers
Legal
  • Write My Essay
  • Thesis Format
  • Custom Papers
  • Coursework Writing
  • Dissertation Writing
  • Essay Writing
How Our Service is Used:
Write An Essay essays are NOT intended to be forwarded as finalized work as it is only strictly meant to be used for research and study purposes. Write An Essay does not endorse or condone any type of plagiarism.
Subscribe
No Spam
© 2023 Write An Essay. All rights reserved.
Write An Essay will be listed as ‘Write An Essay’ on your bank statement.